2000 kVA Dry Type Cast Resin Transformer

1000kva dry type cast Resin transformer

2000kVA Solar Power Transformer (Customized for Xinjiang Solar Pv)

Primary Voltage:34.5KV
Secondary Voltage:0.8KV
Power Rating: 2000 KVA
Connection Type: Dyn11/Yyno or others
Transformer Type: Dry Type Transformer
Standards: ANSI/IEEE, CSA/CAN, DOE
Certificate: UL, cUL, CSA, SGS,CE 

2000kva Dry Type Cast Rrsin Transformer Product Details

    In 2023, we delivered customized 2000kVA dry type cast resin transformers with a voltage ratio of 34.5kV/0.8kV for a solar power plant in Xinjiang, China. Engineered to withstand the region’s harsh environment, these units ensure reliable and efficient power conversion for photovoltaic systems.

Key Features (专业?)

  • Efficient Cooling: Equipped with cooling fans to accelerate heat dissipation, ensuring safe operation under high loads and temperature fluctuations.
  • Smart Protection: Features an advanced temperature control system to monitor thermal status in real-time and prevent overheating.
  • Durable Enclosure: Housed in a robust stainless steel enclosure (IP21), providing superior corrosion resistance and protection against dust ingress, ideal for desert environments.

Technical Specifications: 2000kVA Dry Type Cast Resin Transformer

Rated Capacity
(kVA)
HV
(kV)
Tapping Ranges LV
(kV)
Vector Group No-Load Loss
(W)
75°C Load Loss
(W)
No-Load Current
(%)
Short-Circuit Impedance
(%)
50 20, 22, 24
or others
±5%
±2×2.5%
0.4
or others
Dyn11
Yyn0
or others
380 1300 2.4 6
100 600 2100 2.2
160 750 2600 1.8
200 820 3100 1.8
250 940 3600 1.6
315 1080 4300 1.6
400 1280 5100 1.4
500 1500 6100 1.4
630 1700 7200 1.2
800 1950 8700 1.2
1000 2300 10300 1
1250 2650 12150 1
1600 3100 14600 0.8 8
2000 3600 17250 0.8
2500 4300 20400 0.8
2000 3600 18800 0.8
2500 4300 22400 0.8
滚动至顶部
yingbeng loge
Contact Yingben Factory for a Quote

Our engineering team will provide a customized solution within 24 hours

yingbeng loge
Contact Yingben Factory for a Quote

             Please fill out the form below. Our     engineering team will  provide a customized  solution within 24 hours.